• Arfy Reka Cerdas
  • About Us
  • Our Services
  • News & Articles
  • Project Experience
  • Career
  • English
    • Indonesia (Indonesian)
Menu
  • Arfy Reka Cerdas
  • About Us
  • Our Services
  • News & Articles
  • Project Experience
  • Career
  • English
    • Indonesia (Indonesian)
News

Site Survey For 35WMac Floating PV Power Plant (FPVPP) and High – Voltage Air Transmission Line In The Tembesi Reservoir Area

adminOctober 26, 2023
News

Gender Equality: Spreading the Wings of Opportunity in the World of Work

adminOctober 15, 2023
News

Energize High Voltage Overhead Line (SUTT) 150kV THK – Karawang

adminJune 30, 2023
News

Energize Gardu Induk (GI) 150kV Maloy, Kalimantan Timur

adminJune 30, 2023
News

Survey of Main Substation Interconnections (GI) and High Voltage Air Lines (SUTT), Central Java

adminJune 30, 2023
News

MEP Audit of Hotel Buildings in Surabaya and Offices in South Jakarta

adminJune 30, 2023
News

Survey of Interconnection Substations (GI) and High Voltage Overhead Lines (SUTT), South Sulawesi

adminFebruary 20, 2023
News

Interconnection Grid Survey for a 100MWac Solar Power Plant (PLTS) in Karangkates, Malang.

adminFebruary 18, 2023
News

Supervision work for Sounding and Boring at the Biogas Plant in PKS Sei Meranti.

adminJanuary 28, 2023
News

Energizing the 150kV Pomako Substation (PLTMG Timika) at the end of 2022.

adminDecember 30, 2022
  • 1
  • 2

Contact Us

  • marketing@arfyrekacerdas.com
  • PT. Arfy Reka Cerdas
  • @arfyrekacerdas

Address

Jl. Ki Hajar Dewantara No.28, Sawah Lama, Kec. Ciputat, Kota Tangerang Selatan, Banten 15413

© 2026 · Arfy Reka Cerdas