Energize High Voltage Overhead Line (SUTT) 150kV THK – Karawang

In mid-May 2023, in Karawang district, West Java, the 150kV THK-Karawang High Voltage Air Line (SUTT) belonging to PLN UIP Central Java (JBT) was successfully energized with the contractor PT. Sejahtera Mulia Kencana (SMK) and its engineering design consultant PT. Arfy Reka Smart has 41 tower points.
This SUTT whose civil Detail Engineering Design (DED) work was entrusted to PT. SMK to the PT team. Arfy Reka Smart has been completed well in the first semester of 2023 and is eagerly awaited by PLN UIP JBT to support electricity supply needs to the Jakarta-Bandung high-speed train (KCIC).
The Arfy Reka Smart team in completing their DED experienced problems because the project was stopped during the Covid-19 pandemic in 2020. In 2022 the project was asked to restart and the Arfy team immediately prepared documents in the form of calculation notes and working drawings for around 41 tower points.
PT. SMK has entrusted GI and SUTT work throughout Indonesia for 8x projects to PT. Arfy Reka Cerdas. This is proof of the client’s success and satisfaction with the results of our work.
We are looking forward to collaborating again with PT. SMK in subsequent projects and contribute to electricity development in Indonesia.